Power Generator
SECTOR

TCR serves many clients in the Power Generation Industry with installation and transportation of transformers, generators, turbines and more. We utilize a variety of heavy machinery to provide our services including cranes, gantries, specialized trailers and more. With experienced operators always on call, we can mobilize quickly and excel in the event of an emergency such as an unforeseen power shutdown.

3-Time Generator
JACK & SET

Empire District Electric

Lift and set (1) 326,530 Lb AC Turbine Generator on Cribbing.  Return at later date to lift the same and remove cribbing.  Return once again and lift to set on original foundation.

Generator
INSTALL

Cherokee Data Center – Tulsa, OK

  • 140 Ton crane and special rigging to offload the model 3612 generators from rail cars
  • Trucks and heavy-haul trailers to transport 10 miles across Tulsa
  • 80,000 lbs. capacity fork truck, 1” steel plate and skates to move in and place generators
  • Positioned the generators on elevated concrete foundations
  • Mounted isolator pads once each generator was raised to elevation
  • Lowered generators to sit on the isolators and holes marked for the HIT HY 150 Injection Adhesive anchor bolts
  • Raised generator to place skates under the generator, allowing anchor holes to be drilled and anchors set on each side
  • Lowered each generator down onto the 32 anchor bolts
  • All anchor bolts torqued to Caterpillar specifications
  • Set cooling units, mufflers and support tower air compressors and air receivers for the air starters, expansion joints for intake and exhaust piping

Transformer Move
& INSTALLATION

Waukesha Electric Systems – Riverton, KS to Columbus, KS

Phase I

  1. Offload transformer from railcar to TCR trailer
  2. Transformer Specs: 204,500 lbs

Phase II

  1. Transport load to bridge 
  2.  Install Holland dollies to trailer; now – 25’ wide dual lane
  3. Reinstalled trunion axles to trailer
  4.  Mobilize to site

Phase III

  1. Offload and set transformer in pit 

Offload
TRANSFORMER

At PSO Plant

Transformer was offloaded, transported and set in storage pit using our 8-line Scheulerle trailer and jack & slide system, which TCR designed, engineered, and fabricated in house. This was a one-day job with no incidents.

Feed Water Heater
CHANGEOUT

Kansas City Power & Light Station – Sibley, MO

Taylor Crane & Rigging was challenged with removing two 115,000-lb. vessels and reinstalling two new replacement vessels from the second story of a power generation station, all without blocking the roll-up door to the turbine room beneath it. This restriction required the vessels to be accessed, removed and reinstalled from a distance of 60 feet from the building. To overcome this challenging restriction, TCR raised 100 feet of track beam using two separate gantry systems and slid each vessel along the beams to where they could be safely lowered 60 feet away from the building. Once lowered, two Versa-lifts tandem lifted the old vessels off of the track and lifted the new vessels back onto the track.

Additionally, the vessels were too heavy to be skated safely across the second story floor, so TCR used additional track beams inside the building to distribute the weight. TCR used a tailor-made jack and slide system designed in-house to move the vessels across the beams to and from the track beams placed outside. The project was completed on time and to the satisfaction of the customer, who stated, “Your crew interacted well with our crew, overcame obstacles and completed this project safely.

Related
PROJECTS

9

Transformer Switch over Mezzanine

Taylor moved (2) transformers on Mezzanine above chrome plating dip tanks. The transformers had to be switched. The first one weighed 1000# and the second one weighed 1700#..

9

Ball Mill Tire Change Out

Southern Welding contracted TCR to change out two 15′-diameter, 31,000-lb. tires and the adjacent rings (also 15′ in diameter) at the Central Plains Cement plant in Tulsa, OK..

9

Feed Water Heater Changeout

Taylor Crane & Rigging was challenged with removing two 115,000-lb. vessels and reinstalling two new replacement vessels from the second story of a power generation station ..

9

Plant Equipment Installation- New Plant

Supplied Manpower & equipment for Turnkey Installation of:

  • Over 40 Niagara clearing metal stamping presses
  • 22 Orttech Hydraulic units
  • 12 Sesco stock feeding systems…
9

Rear Modular Assembly Installation

Taylor Crane was awarded the contract from Forie Automation for the rear modular assembly project at the Woodbridge assembly plant in KC, MO. This project consisted of installation of the following:..

9

Sutton Table Removal & Relocation

Lower, remove, and relocate sutton tables and straightener.  Taylor provided manpower, equipment and materials necessary to modify the in-board and out-board table tops and drive bases for the straightener. 

VISIT US

Coffeyville, KS - Tulsa, OK

CALL US

(620) 251 - 1530

SEND US E-MAIL

tcr@taylorcrane.com

© 2024 TAYLOR CRANE & RIGGING
DCAD DESIGN